June 2015
We always knew that we wanted significant strength in the first floor structure, as the point loads of a row of 19″ racks full of military radios is quite significant. When our structural steel consultants revisited their calculations they decided that some of our steel work should be upgraded in situ. This put the overall project back about 4 weeks but better safe than sorry!